2014 Bond & 2016 Levy Projects

Districtwide Improvements

Projects completed since 2014 bond and 2016 capital levy

Every Facility 

  • Wireless network and building exterior camera coverage was added at all district facilities.
  • The district’s aging telephone system was upgraded and wireless computing devices were purchased.

Challenger

  • Replaced the gym's sound system
  • Upgraded the building’s fire panel

Columbia

  • Replaced the gym’s sound system
  • Replaced aged sections of the roof
  • Conducted combustion analysis and rebuilt an aging boiler unit

Discovery

  • A new multipurpose room and kitchen was constructed
  • Installed digital heating and ventilation control systems
  • Repainted the building’s aging exterior

Endeavour

  • Replaced the gym’s sound system
  • Conducted combustion analysis and rebuilt an aging boiler unit

Fairmount

  • Replaced the gym’s sound system
  • Added a new playground
  • Replaced aged sections of the roof

Horizon

  • Replaced the gym’s sound system
  • Updated the school’s communication with a new readerboard

Lake Stickney

  • Newly constructed and opened in September 2016

Mukilteo

  • Replaced the gym’s sound system
  • Replaced gym floor
  • Filled in reading pits and installed new carpet in the library

Odyssey

  • Replaced the gym’s sound system

Olivia Park

  • Replaced the boiler
  • Installed digital heating and ventilation control systems
  • Replaced the gym’s sound system

Pathfinder Kindergarten Center

  • Newly constructed and opened in September 2017

Picnic Point

  • Replaced the gym’s sound system
  • Replaced gym floor
  • Replaced the roofing that covers the walkways
  • Filled in reading pits and installed new carpet in the library

Serene Lake

  • Replaced the gym’s sound system
  • Replaced rooftop heating and ventilation unit

Explorer

  • Replaced locker room flooring, lighting and fixtures
  • Upgraded sound system in the gym

Harbour Pointe

  • Expanded and renovated the music facilities and weight room
  • Replaced deteriorated grass playing surfaces with safer artificial surface
  • Improved building ramp to conform to ADA standards

Olympic View

  • Constructed a new addition that includes an expanded gym, auxiliary gym, cardio/weight room, locker rooms, five new classrooms, band room, choir room, rehearsal rooms, instrument storage and a music library
  • Replaced aged sections of the roof

Voyager

  • Replaced deteriorated grass playing surfaces with safer artificial surface
  • Replaced an aging transformer that provides the school’s main power supply
  • Added an electronic readerboard
  • Replaced aged sections of the roof

Aces

  • Repurposed an existing portable building to accommodate science curriculum
  • Replaced aged sections of the roof
  • Portables were placed to accommodate capacity constraints related to our community's growth.

Kamiak

  • Replaced aging boiler
  • Provided a safety training room and team meeting room at the athletic fields
  • Removed and replaced the worn track surface
  • Replaced the aging artificial field surface
  • Replaced the fire curtain in the auditorium
  • Portables were placed to accommodate capacity constraints related to our community's growth.

Mariner

  • Added a new Women’s locker room
  • Replaced inefficient lighting and ventilation systems
  • Removed and replaced the worn track surface
  • Replaced the aging artificial field surface
  • Portables were placed to accommodate capacity constraints related to our community's growth.