Columbia
Columbia Elementary School

NOVEMBER 3, 2026, CAPITAL BOND FOR SCHOOLS
A proposed $400 million school construction bond will appear on the
Nov. 3 ballot and includes projects at every school in Mukilteo School District.
At Columbia Elementary School, the proposed projects focus on safety and security, technology infrastructure, and replacement of aging building systems and playground.
COLUMBIA ELEMENTARY SCHOOL
Columbia Elementary School was built in 1989. While the building structure remains in good condition, work is needed to improve safety and security and replace building systems.
2026 CAPITAL BONDS FOR SCHOOLS
The volunteer Capital Bond Advisory Committee (CBAC) evaluates and prioritizes facility needs across the district to help ensure bond funding is focused on the highest-priority projects. For the 2026 bond, the committee recommended $400 million in projects from approximately $975 million in identified needs.
The proposed bond includes the following improvements at Columbia Elementary School:
- Building access controls – Add additional doors to the access control system and install door contacts on all exterior doors, allowing staff to monitor whether any exterior doors are open.
- Integrated door hardware – Install door hardware that can be locked from the inside using a thumb turn that clearly indicates whether it is locked or unlocked. The focus will be on spaces beyond standard classrooms, including the library, gym, common spaces, and offices.
- Technology infrastructure – Modernize aging network infrastructure to support teaching, protect student and district data, and keep essential operations running.
- Roofing – Replace aging roof.
- Elevator – Replace elevator.
- Playground – Replace play structure and surface to improve accessibility.
PREVIOUS INVESTMENTS AT COLUMBIA ELEMENTARY SCHOOL
Since 2014, the Mukilteo School District community has supported investments at Columbia Elementary School to address aging infrastructure and provide students and staff with safe, functional, and reliable learning environments, including:
- Addition of security cameras and emergency radios
- Addition of access controls at main entry and egress points
- Replacement of courtyard gates
- Addition of integrated door hardware for standard classrooms
- Installation of emergency communications systems
- Improvements to wireless connectivity
- HVAC upgrades
- Refresh of sand field